Funding Agency: : Government of Nepal Client: Sunsari Morang Irrigation Project, Department of Irrigation Date: 15 July 2017 – 15 January 2019 The main objective of the consulting service is to prepare the detailed engineering design and procurement documents of SMIP headwork at Chatara. The specific objectives of the services are to: Assess the appropriate […]

Funding Agency: Asian Development Bank Client: Department of Irrigation, Nepal Date: Mar 2015 – Jul 2016 The main objectives of the consulting services are as follows : (i) Produce climate change scenario based on FHFRMs in key priority areas across the country . (ii) Recommend FRM interventions in the key priority areas identified in consultation […]

Funding Agency: Asian Development Bank Client: Department of Irrigation, Nepal Date: Aug 2013 – Apr 2015 MFLW Task 2 involved country level investigations, capacity building, and pilot testing in Bangladesh, India and Nepal to support the application of innovative and smart water efficient technologies and management systems in the design and implementation of ADB investments. […]

Funding Agency: Government of Nepal Client: Department of Irrigation Date: Jul 2016 – Dec 2017  The main objective of this study is to perform Detailed Feasibility study of Kaligandaki-Tinau Diversion Multipurpose Project. A. Hydropower Development Plan – Install capacity of power generation of 104 MW, Length of Tunnel – 30 KM, Diameter of tunnel – […]

08-2-2016  |  Published in Irrigation, Ongoing Projects

Funding Agency: Government of Nepal Client:  Department of Irrigation (DoI)/Water Resources Project Preparatory Facility Date: January 2016 – December 2018 The project will include the specific tasks like water resource assessment, land resource mapping, and prioritization of irrigation projects and preparation of the Irrigation Master Plan (IMP). Similarly the project will also be carried out within remote […]

Funding Agency: Swiss Development Co-operation Client: Embassy of Switzerland in Nepal Date: March 2015 – February 2019  The main objective of the Programme Management and Implementation Support Consultant (PMISC) is to provide management and implementation support to the Government of Nepal on behalf of the Government of Switzerland to implement the Small Irrigation Programme (SIP). The […]

08-2-2016  |  Published in Irrigation, Ongoing Projects

Funding Agency: Asian Development Bank (ADB)  / Japan Fund for Poverty Reduction (JFPR) Client: Asian Development Bank  (ADB) Date: Aug. 2013 – July 2014 The Asian Development Bank (ADB) is financing a research and development technical assistance (TA) to support the identification, assessment, and design of new investments for more sustainable, water-efficient irrigated agriculture. The TA responds directly […]

Funding Agency: Asian Development Bank   Client:Government of Nepal, Department of Irrigation (DOI), Department of Water Induced Water Prevention Date: March 2015 – October 2015  The main objectives of the consulting services are as follows : (i)    Produce climate change scenario based on FHFRMs in key priority areas across the country . (ii) Recommend […]

Funding Agency: The World Bank/ Department of Irrigation    Client: The World Bank/ Department of Irrigation Date: June 2009 – March 2013  The objective of Irrigation and Water Resource Management Project (IWRMP) is to improve irrigated agriculture productivity and management of selected irrigation schemes, and enhance institutional capacity for integrated water resources management. The primary target […]

Funding Agency: Government of Nepal, Department of Irrigation Client: Irrigation Feasibility Study and Construction Quality Program, Department of Irrigation Date: June 2014 – June 2016 Sunkoshi-Marin Diversion Project (SMDP) is located at Sindhuli District of CDR and the diverted water is projected to irrigate agricultural lands in Bara, Rautahat, Sarlahi, Mahottari and Dhanusha District through Bagmati Irrigation Project […]