Funding Agency/ Client: The World Bank Date: March 2017 – Nov 2017 The project development objectives are to: Increase access to improved water and sanitation services in project areas; and Develop and implement long-term support mechanism to promote the sustainability of community managed rural water supply schemes in 55 Districts of Nepal. Actual services provided […]

Funding Agency/Client: Asian Development Bank Date: May 2017 – Dec 2017 The outcome of the PPTA for the Second Kathmandu Valley Water Supply Improvement Project will be an agreed project design and feasibility study for the ensuing project that satisfies the requirements of the government and ADB, which includes ensuring technical feasibility, economic and financial […]

Funding Agency: Asian Development Bank Client: Melamchi Water Supply Development Board, Nepal Date: Feb 2017 – Feb 2018 The primary objective of the Design Consultancy Services for Melamchi 2: Yangri and Larke Water Diversion Project is to provide services for engineering design including preparation of bidding documents for a project to divert 340 MLD water […]

Funding Agency: Government of Nepal Client: Project Implementation (Irrigation Unit) Date: Nov. 2015 – Aug 2017 The Project is one of the integral components of Bagmati River Basin Improvement Project (BRBIP) and aims to contribute an overall objective of the BRBIP by increasing a volume of water of the Bagmati River in winter season by constructing […]

Funding Agency: Government of Nepal Client: Water and Energy Commission Secretariat (WECS), Bagmati River Basin Improvement Project (BRBIP)            Date: June 2010 – Dec. 2015  The Bagmati River Basin Improvement Project (BRBIP) builds on the general public’s desire to restore the river environment in Kathmandu Valley and the Government’s efforts to mitigate the impact of water-induced disasters […]

Funding Agency: International Bank for Reconstruction and Development  Client: Solid Waste Management Technical Support Center (SWMTSC) Date: January 2015 – June 2017 The project aims to improve the quality and financial sustainability of SWM services in participating municipalities, through an output-based subsidy scheme. The project is designed to provide incentives to enable the gradual development of a beneficiary […]

Funding Agency: Asian Development Bank (ADB) Client: Ministry of Physical Planning and Works / Asian Development Bank Date: June 2010 – Dec. 2015 The Consultant will also support to develop proper benchmarking, performance evaluation and rating system of the service providers along with systems to improve provision of services to the citizens by such service providers. […]

Funding Agency: Ministry for Foreign Affairs of Finland Client: Ministry for Foreign Affairs of Finland / Ministry of Local Development, Nepal Date:  May 2012- July 2012 The Government of Nepal and the Government of Finland jointly launched the Regional Solid Waste Management Project (RWMP) in Sunsari and Morang Districts, Nepal.  The main purpose of the […]

Funding Agency: Ministry for Foreign Affairs of Finland Client: Ministry for Foreign Affairs of Finland / Ministry of Local Development, Nepal Date:  June 2010 – Dec 2012 The Overall Objective of this project was (1) to improve sanitary living conditions in the urban areas of the two districts and (2) to contribute to poverty alleviation […]

Funding Agency: SNV Client: DWSS/ SEIU Date:  May 2013 – Mar 2014 The intention of this study is to review the existing policy environment, regulatory frameworks, legislation and institutional arrangements and inform SNV Nepal’s about recently started Urban Sanitation and Hygiene Programme. The study must identify gaps, overlaps, inconsistencies, un-clarities and opportunities in existing policies regarding […]