Funding Agency: Asian Development Bank Client: Nepal Electricity Authority, Nepal Date: October 2017 – October 2019 The Government of Nepal has a policy of providing all district headquarters with grid electricity as soon as practicable and of providing electricity to all the households by 2027. A clear policy on priorities and an execution plan for rural […]

Funding Agency: The World Bank Client:Nepal Electricity Authority, Environment and Social Studies Department Date: Feb 2017 – Aug 2017 Kali Gandaki A Hydro Power Plant (KGAHPP) is the largest plant in operation in Nepal commissioned in 2002. The development objectives of the Kali Gandaki A Hydropower Plant Rehabilitation Project for Nepal are to improve the […]

Funding Agency: : KfW Development Bank Client: Nepal Electricity Authority, Nepal Date: July 2017 – Sept 2017 The project consists of two substations (one existing one in Lekhnath, Pokhara, which will be expanded and a new substation in Damauli) as well as about 40 km of 220 kV transmission line in-between. Also there is one […]

Funding Agency: : Government of Nepal Client: Sunsari Morang Irrigation Project, Department of Irrigation Date: 15 July 2017 – 15 January 2019 The main objective of the consulting service is to prepare the detailed engineering design and procurement documents of SMIP headwork at Chatara. The specific objectives of the services are to: Assess the appropriate […]

Funding Agency: : Kreditanstalt für Wiederaufbau (KfW), KfW Group, Germany Client: Alternative Energy Promotion Centre (AEPC), Nepal Date: April 2017 – Oct 2019 The main objective of the project is to improve the living standard, increase employment and productivity while reducing dependency on traditional energy and attain sustainable development through the integration of alternative energies, […]

Funding Agency: Government of Nepal Client: Nepal Electricity Authority (NEA) Date:  March 2017 – Sep 2018 Tamakoshi-V Hydroelectric Project is located in Dolakha District of Janakpur Zone in the Central Development Region of Nepal. The entire project area lies in Khare, Orang and Lamabagar Village Development Committees. The proposed project is conceptualized to develop as […]

Funding Agency: World Bank Client: Nepal Investment Board Date:  Feb 2013 – Jan 2014 The Nepal Investment Board (NIB) plans to find investment ready projects, and it has authority in all the sectors including hydropower for projects above 500 MW. In connection with this, IB was reviewing and facilitating four hydropower projects – 650 MW […]

Funding Agency: WAPCOS Ltd. Client: WAPCOS Ltd. Date:  Sep 2016 – Feb 2017 Pancheshwar Multipurpose Project (PMP) is a joint project of Nepal and India proposed on the Mahakali River. The PMP comprised two major componentPancheshwar High Dam (PHD) – consisting 311 m high rock fill dam, a spillway, two underground powerhouses and associated structures. […]

Funding Agency: World Bank Client: World Bank Date:  Sep 2016 – July 2017 The two key objectives of this project are to assist the GoN in (i) assessing the current national dam safety framework and recommending how to strengthen it; and (ii) reviewing the current guidelines for study and design of hydropower generation projects including […]

Funding Agency: Government of Nepal Client: Department of Electricity Development (DoED), Nepal Date: July 2016 – Jan 2019  DOED intends to procure services of domestic consulting firms to conduct feasibility study and Environmental Study (IEE/EIA) of small and medium hydropower projects using government funds. The main objective of the consulting services is to conduct feasibility […]