Funding Agency: : Kreditanstalt für Wiederaufbau (KfW), KfW Group, Germany Client: Alternative Energy Promotion Centre (AEPC), Nepal Date: April 2017 – Oct 2019 The main objective of the project is to improve the living standard, increase employment and productivity while reducing dependency on traditional energy and attain sustainable development through the integration of alternative energies, […]

Funding Agency: Government of Nepal Client: Department of Electricity Development (DoED), Nepal Date: July 2016 – Jan 2019  Rupagad Khola HP is located in Majphal and Dunai VDCs in Dolpa district of Mid-Western Development Region. The proposed headwork site is approximately 5 km South-East of Juphal Airport. The proposed intake site of the project lies […]

Funding Agency: Government of Nepal Client: Nepal Electricity Authority (NEA) Date:  March 2017 – Sep 2018 Tamakoshi-V Hydroelectric Project is located in Dolakha District of Janakpur Zone in the Central Development Region of Nepal. The entire project area lies in Khare, Orang and Lamabagar Village Development Committees. The proposed project is conceptualized to develop as […]

Funding Agency: World Bank Client: Nepal Investment Board Date:  Feb 2013 – Jan 2014 The Nepal Investment Board (NIB) plans to find investment ready projects, and it has authority in all the sectors including hydropower for projects above 500 MW. In connection with this, IB was reviewing and facilitating four hydropower projects – 650 MW […]

Funding Agency: WAPCOS Ltd. Client: WAPCOS Ltd. Date:  Sep 2016 – Feb 2017 Pancheshwar Multipurpose Project (PMP) is a joint project of Nepal and India proposed on the Mahakali River. The PMP comprised two major componentPancheshwar High Dam (PHD) – consisting 311 m high rock fill dam, a spillway, two underground powerhouses and associated structures. […]

Funding Agency: World Bank Client: World Bank Date:  Sep 2016 – July 2017 The two key objectives of this project are to assist the GoN in (i) assessing the current national dam safety framework and recommending how to strengthen it; and (ii) reviewing the current guidelines for study and design of hydropower generation projects including […]

Funding Agency: Government of Nepal Client: Department of Electricity Development (DoED), Nepal Date: July 2016 – Jan 2019  DOED intends to procure services of domestic consulting firms to conduct feasibility study and Environmental Study (IEE/EIA) of small and medium hydropower projects using government funds. The main objective of the consulting services is to conduct feasibility […]

Funding Agency: Government of Nepal Client: Department of Irrigation Date: Jul 2016 – Dec 2017  The main objective of this study is to perform Detailed Feasibility study of Kaligandaki-Tinau Diversion Multipurpose Project. A. Hydropower Development Plan – Install capacity of power generation of 104 MW, Length of Tunnel – 30 KM, Diameter of tunnel – […]

Funding Agency: Government of Nepal Client: Project Implementation (Irrigation Unit) Date: Nov. 2015 – Aug 2017 The Project is one of the integral components of Bagmati River Basin Improvement Project (BRBIP) and aims to contribute an overall objective of the BRBIP by increasing a volume of water of the Bagmati River in winter season by constructing […]

Funding Agency/Client: Upper Solu Hydro Electric Company Pvt. Ltd. (USHEC) Date: Aug 2011 – March 2013 Upper Solu Hydro Electric Company (USHEC) had recently envisaged the possibility of development of Sisa Khola “A” HEP with an installed capacity of 2.6 MW in the Sisa Khola, a tributary of Solu Khola in the vicinity of the […]