
Funding Agency: Asian Development Bank
Client: Melamchi Water Supply Development Board, Nepal
Date: Feb 2017 – Feb 2018
The primary objective of the Design Consultancy Services for Melamchi 2: Yangri and Larke Water Diversion Project is to provide services for engineering design including preparation of bidding documents for a project to divert 340 MLD water from Yangri and Larke rivers to the existing Melamchi Diversion Tunnel in order to ensure an integrated water supply system of 510 MLD capacity of treated water. The three main components of this project includes:
Actual services provided by the firm within the assignment:
The Consultancy Services includes the following scope of works related to the above components:
Besides, consultant is responsible for detail field survey, geological and geotechnical investigation (along with engineering geological mapping of Tunnel alignment, headworks area and access roads), socio-economic studies, Environmental Impact Assessment (EIA), Environmental Management Plan (EMP), preparation of land acquisition compensation and resettlement plan, social upliftment support plan, hazard and risk assessments, ground water investigations, review, modification and revisions of basic design.
©2013, All Rights Reserved Total Management Services