Consulting Services For Feasibility Study of Dharan - Leuti Road Tunnel (4.9 km), Sunsari, Dhankuta
Funding Agency: Government of Nepal/Nepal Electricity Authority
Client: Department of Road,
Chakupat, Lalitpur
Date: May 2021 – October 2021
Dharan- Leuti Road Tunnel lies in Province 1. This road tunnel will be part of the Koshi highway (309 km)
which will be the shortest highway to connect India and China. The Feasibility study of the Dharan – Leuti Road
Tunnel will be done between the Dharan and Leuti Khola. The length of the
tunnel will be approximately 4.9 Km and this tunnel will shorten the length of the road between Dharan and Leuti significantly and reduce the traveling time and
operating cost.
The objective of the proposed consulting services is to carry out the following:
1. Feasibility Study of the proposed Tunnel Road including technical, economic, and financial availability and,
2. Soil Investigation (2D Electrical Resistivity Survey) and detailed interpretation and Preliminary design of Tunnel Road.
Overall Services provided:
In order to meet the objective, the scope of the proposed study included but not be limited to the following:
- Exiting Information Collection and Study
- Survey and Site Reconnaissance
- Drone Mapping, DGPS, and 3D Modelling
- Geologic Mapping
- Subsurface Investigations
- Traffic Studies
- Seismicity Analysis
- Preliminary Design and Drawings
- Economic Analysis
- Reporting