Detailed Engineering Survey , Design and Report preparation of a Packages: i) Chitwan Piple Gadauli Parewakot Chepangmarg (5 km); ii) Nawalparasi Ghosarghat (Narayani River) Magarkot (9 km); iii) Nawalparasi Bis

2023-12-06

Funding Agency: Government of Nepal
Client: Department of Road
Date: March 2015 – January 2016  

The objective of the consultancy work is :

  • To carry out detailed engineering survey and design of 69 KM of road which includes Chitwan Piple Gadauli Parewakot Chepangmarg (5 km);Nawalparasi Ghosarghat (Narayani River) Magarkot (9 km); Nawalparasi Bishnunagar Bulingtar (30 Km) and Tanahnu Gomantal Bulingtar (25 Km) .
  • To perform alignment detailed survey and design.
  • To perform socio-economic and traffic study.
  • To suggest option of upgrading and design accordingly.
  • To develop environmental mitigation plan to reduce environmental impacts due to the road activities.
  • To prepare detailed project report of the stated road(s) based on some techno-economical approach.
  • To develop project implementation plan.

 

Overall Services provided:

The firm shall carry out the necessary field works along the alignment. The firm shall be responsible for accuracy, interpretation, analysis of all data received and for the conclusion and recommendations in their report. The scope of work to be carried out by the firm shall include but may not be limited to the following :

  1. Detailed Engineering survey and design road of 69 KM.
  2. Desk study.
  3. Preliminary Site Visit
  4. Socio economic studies of influence area with maps and sketches that includes demographic picture, land use pattern, trade, industry and commerce, health, education, transport and communications network (existing and planned) and administrative facilities.
  5. Traffic study
  6. Feasibility study of New Road Section.