Detailed Feasibility Study and EIA Study of Upper Bheri PROP Hydroelectric Project (325 MW)
Funding Agency/Client: Integrity Mobility Services Pvt. Ltd. (IMS)
Date: May 2022 – May 2023
In order to conduct a feasibility
study, the following works are required to be performed in stages:
a. Data Collection and review
b. Reconnaissance Survey
i. Preliminary Assessment of Hydrology
ii. Geology of the Project area
iii. Identification of project alternatives
iv. Engineering Geological conditions at project structures
v. Selection of the best alternatives
c. Project Optimization Study
i. Hydrology and sediment study
ii. Geology and Geo-Technical Evaluation
iii. Project Component Preliminary Design
iv. Plant Optimization
d. Feasibility Study
i. Project Component Design
ii. Power and Energy
iii. Cost Estimate
iv. Construction Schedule
v. Financial Evaluation
vi. Feasibility Study Report and Drawings