Detailed Feasibility Study and EIA Study of Upper Bheri PROP Hydroelectric Project (325 MW)

2024-09-04

Funding Agency/Client:  Integrity Mobility Services Pvt. Ltd. (IMS)

Date: May 2022 – May 2023

In order to conduct a feasibility study, the following works are required to be performed in stages:

                                      a.           Data Collection and review

                                      b.           Reconnaissance Survey

                                                                i.           Preliminary Assessment of Hydrology

                                                              ii.           Geology of the Project area

                                                              iii.           Identification of project alternatives

                                                              iv.           Engineering Geological conditions at project structures

                                                              v.           Selection of the best alternatives

                                        c.           Project Optimization Study

                                                                i.           Hydrology and sediment study

                                                              ii.           Geology and Geo-Technical Evaluation

                                                              iii.           Project Component Preliminary Design

                                                              iv.           Plant Optimization

                                      d.           Feasibility Study

                                                                i.           Project Component Design

                                                              ii.           Power and Energy

                                                              iii.           Cost Estimate

                                                              iv.           Construction Schedule

                                                              v.           Financial Evaluation

                                                              vi.           Feasibility Study Report and Drawings