Feasibility Study, Detailed Engineering Survey, Soil Investigation and Detailed Design of 56 Bridges

2023-12-06

Funding Agency: Government of Nepal
Client: Department of Road, Bridge Branch
Date: Sep 2015 – May 2017

The Department of Road, Bridge Branch intends to utilize services of engineering consulting firms well experienced in the fields of soil investigation, hydrological studies, bridge engineering, river training works, environment aspects etc. for providing engineering consulting services for detail work of proposed 10 Bridge(s) including river training works, and approach roads namely :

S.NName of BridgeName of RoadDistrict1.Mahuli Khola BridgeDiman Hulaki Rajmarga dekhi Dakshin Goithi wada no. 9 hundai Goithi wada no. 5 dekhi purwa GoithiSaptari2.Budhi Khola BridgeMorang Sadarmukam Biratnagar dekhi Tanki Sinuwari Hundai Sunsari Sadarmukam Inaruwa Jane Batoma Mudheri BhaluwaghatmaSunsari-Morang3.Seuti Khola BridgeDharan Panchakanya Kerabari RoadSunsari4.Sunsari Khola BridgeDhuski VDC wada no. 3 and Basantapur VDC WADA NO. 7 JodneSunsari-Morang5.Shera Kholama CulvertShera Khola Hasposa VDC 5Sunsari6.Khuniyadharma Pakki BridgeSunsari7.Lothar Khola BridgeLothar-Chuniyadhara-MalekhuChitwan8.Godawari Khola BridgeGwarkho Lubhu LamatarLalitpur9.Adhuwa Khola BridgeMahendra HighwayJhapa10.Suwa Khola BridgeItahari-6, Malangawa Tole Bikash Sastha ra Nabhapratibha Tole Bikash Sastha bichna jodePanchthar11.Sawa Khola BridgeYasok Mayiawa RoadPanchthar12.Fame Khola BridgePhidam Ranitar Lungrup RoadPanchthar13.Nibu Khola BridgeNawamidanda Phaktep RoadPanchthar

The objective of this job is to design a safe, reliable and cost effective bridge using the appropriate technology.

Actual services provided by the firm within the assignment:

The scope of services will include, but not limited to, carrying out the following activities:

  • Desk study including collection of data, maps and other information and planning of the works.
  • Field work including general reconnaissance, feasibility study, detailed engineering survey of the site.
  • Field survey, topographic survey, site selection and environmental study, detailed hydrometric and hydrological study and preliminary soil investigation in test pits.
  • Detailed design works, preparation of cost estimates including bridge type selection, design of bridge, approach roads and river training works and preparation of drawing works.
  • Soil investigation