Water Resource Development
- LOAN-3057 NEP - Bagmati River Basin Improvement Project – BIP: PIIU-ICB/01- Detailed design of Nagmati Dam (43448-013)
- Conception and installation of Bagmati River Basin Decision Support System, Flood Forecasting and Early Warning System, Water Quality Monitoring System and Preparation of Bagmati River Basin Integrate Master Pla
- GRANT-0299 NEP: Water Resources Project Preparatory Facility – 3 Flood Hazard Mapping and Preliminary Preparation of Flood Risk Management Projects (45206-001)
- Consulting Services for Designing M&E/MIS System for RWSS sector in MoPPW of the GoN- WB
- Nepal Water Resources Knowledge Base Development Project
- Detailed Planning, Engineering Design for Command Area Development works of various branches of Bange kulo of Western main canal of Babai Irrigation Project- Bardiya
- Assessment of Mountain Hydrogeology for Sustainable Exploitation of Groundwater, Sindhupalchowk and Ramechhap (WRRDC/RFP/01/077-78)
- Intensive Flow Measurement and River Cross-Section Survey at Snow Stations
- Operational System Design and Establishment for Daily, Seasonal and Annual Snow and Glacier Monitoring
- Bathymetric, Topographic and GPR Survey of Glacial Lakes
- Assessment of Mountain Hydrogeology for Sustainable Exploitation of Groundwater, Sindhupalchowk and Ramechhap (WRRDC/RFP/01/077-78)
- TA 9803 NEP Bagmati River Basin Improvement Project – Integrated Water Resources Management (43448-013) Project
- Intensive Flow Measurement and River Cross-Section Survey at Hydrological Stations Under Province 3 and Province 5