Environmental & Social Studies
-
Consulting Services for Tender Design Preparation of Bidding Document, Construction Supervision and Post construction services Upper Arun Hydroelectic Project in Nepal (Phase-A, B & C)
-
Consulting Services of Middle Bhotekoshi Hydroelectric Project (102 MW)
-
ESIA, CIA and Social Planning Studies For Upper Arun Hydroelectric Project and Ikhuwa Khola Hydropower Project Power Sector Reform and Sustainable Hydropower Development Project (PSRSHDP)
-
Detail Engineering Design & Preparation of Tender Documents of Upper Modi Cascade (Upper Modi ‘A’ 42 MW and Upper Modi 18.2 MW) Hydroelectric Project
-
South Asia Sub-regional Economic Cooperation (SASEC) Power System Expansion Project – Safeguard Implementation and Monitoring Works (Contract No: ESSD-02-2073/074)
-
Kali Gandaki A Hydropower Plant (144 MW) Rehabilitation Project –Implementation of Environmental and Social Mitigation Measures and Monitoring Works
-
Consulting Services for Preparation of Distribution System/ Rural Electrification Master Plan Grant No. 0397-NEP (EF) Contract No. DSMP/REMP-074/75
-
Koshi Corridor 220 KV Transmission Line Project
-
Detailed Engineering Design & Preparation of Bidding Documents of Rolwaling Diversion
-
Detailed Feasibility Study of Kaligandaki- Tinau Diversion Multipurpose Project – 104 MW
-
Detailed Engineering Design and Tender Document Preparation of Tamakoshi V HEP (87 MW)
-
Collection of field data for one season EIA Study for proposed Pancheshwar/Rupaligad HEP
-
Feasibility Study & IEE Study of Ikhuwa Hydropower Project (8.6 MW)
-
Kulekhani III Hydroelectric Project: Construction Supervision and Construction Management
-
Supplementary Contract for Consultancy Services for Preparation of Tender Document, Detailed Design & Engineering, and Construction Supervision of Electro-Mechanical, Hydro-Mechanical & Transmission Line works
-
Evaluation of Bid Proposals Supervision and Management of Construction of Solu Hydroelectric Project (23.5 MW)
-
Feasibility and IEE studies of 5.Chadu Khola; 6.Rupgad Khola 7. Loti Karnali
-
Small Irrigation Programme (SIP) Phase I
-
Consulting Services for Feasibility study of Sun Koshi Marin Diversion Project
-
Detailed Feasibility Study of Kaligandaki- Tinau Diversion Multipurpose Project – 104 MW
-
LOAN-3260 NEP - Earthquake Emergency Assistance Project – Construction Supervision Consultant for Road Component EEAP/DOR/CSC-01
-
Consulting Services for Feasibility Study and Detailed Engineering Design for the Sitapaila-Dharke Road – KWT
-
Feasibility Study, Detailed Engineering Survey, Hydrological Study and Detailed Design of Bridges (Contract No.: BP-661-DSD-06-068/69)
-
Grant-0227 Nep - Transport Project Preparatory Facility (Formerly Transport Project Preparatory And Capacity Development Facility) – Project Preparatory Consultant 2 For Road Component (Ppc2-Road)
-
LOAN-3260 NEP: Earthquake Emergency Assistance Project – EEAP/DOR/CSC-01 Construction Supervision Consultant for Road Component
-
Grant No: 0099- NEP - Project Management Consulting Services for SASEC – Information Highway Project
-
Conception and installation of Bagmati River Basin Decision Support System, Flood Forecasting and Early Warning System, Water Quality Monitoring System and Preparation of Bagmati River Basin Integrate Master Pla
-
Japan fund for Poverty Reduction (JFPR) Grant 9159-NEP: Support for Targeted & Sustainable Development Program for Highly Marginalized Groups (Contract No. JFPR 9159-NEP-01).
-
Loan No. 3255-NEP - Detail Design Consulting (DDC) Services for Melamchi Phase 2 Contract No.: MDS/M2/C/03
-
TA-7973 - Strengthening Higher Engineering Education – NEP: (45192-001)
-
TA-7666-NEP - Energy Access and Efficiency Improvement Project II
-
Detailed Design and Preparation of Tender Documents for Upper Tamakoshi HEP(463 MW)
-
Detailed Survey of Marshyangdi 132 kv Transmission Line Corridor Project
-
Support to EIA Study for proposed Arun – III Hydro Electric Project (900 MW) in Nepal
-
Detailed Engineering Design & Preparation of Bidding Documents of Rolwaling Diversion
-
Feasibility review, DPR Preparation, Detailed Engineering Design, IEE Review and Preparation of IEE for HEP and 132kv Transmission Line, Preparation of Tender Document for Upper Solu Hydroelectric Project
-
Undertaking Scoping, TOR, EIA of Proposed Khimti II Hydropower Project (27 MW)
-
TA 4834 NEP - Preparing Governance Reforms and Decentralization Cluster Program I
-
Dalit Empowerment and Inclusion Project (DEIP)
-
IDA Grant No. H339-NEP - Road Sector Development Project: Feasibility, Detailed Design and Construction Supervision
-
ADB Grant 0051 - Feasibility Study & Detailed Engineering Design of Road Connectivity Sector Project
-
ADB GRANT NO. 0150- NEP(SF) - Consulting Services to Koshi Bridge (Chatara) under Emergency Flood Damage Rehabilitation PROJECT -
-
Hulaki Rajmarg Project-Detailed Survey and Design of 5 Bridges
-
Puspalal (Mid Hill) Highway Project: Detailed Design for Upgrading of Highway to Blacktop Standard – Package 3
-
Feasibility Study of Rupnagar kanchhanpur Bypass Road, Saptari, Begadawar 9 Dhaneshwarchowkkhola Chaulikha bazar Road, Dhanusha & Banjyangkharka Sakine Paithapata Thaldung Road, Argakhachi-Contract ID: P21-PMEU-
-
Surveys, Investigations and Detailed Design for Koshi Bridge as VO No. 2 under Road Connectivity Sector I Project – ADB
-
Surveys, Investigations and Detailed Design for Sub Regional Transport Enhancement Project as VO No. 4 under Road Connectivity Sector I Project – ADB
-
Detailed Survey,Design,Cost Estimate,Report of Kaliksthan -Bhanjyang-Dhunge Road Project
-
Consulting Services for Project Management Consultancy (PMC) Melamchi Water Supply Project
-
Preparing the Kathmandu Valley Urban Environment Improvement Project
-
Community Based Water Supply and Sanitation Project (CBWSSP) : Package I for the Pilot Batch
-
Preparing the Improved Water Quality Supply, Sanitation and Service Delivery Sector Development Program – ADB TA No. – 4972-NEP
-
Innovations for More Food with Less Water- Task 2: Country and Project-Specific Recommendations and Pilot Initiatives
-
Support to EIA Study for proposed Arun – III Hydro Electric Project (900 MW) in Nepal
-
Kabeli-A Hydroelectric Project - Preparation of Cumulative Impact Assessment (CIA) for the Tamor River Basin, various Environment and Social Safeguards and Capacity Building Activities for the Department of Elec
-
Tamakoshi - Kathmandu 220/400 KV Transmission Line Project (ESSD-03-2074/075) (Loan 2808/ Grant 0270/ Grant 0271)
-
Consulting Services for Project Preparation and Technical Supervision Services for Electricity Transmission Project: Transmission and Substation Activities
-
Construction Supervision Consultant for SASEC Highway Improvement Project (SHIP-CSC) (Kamala to Kanchanpur)- Contract No.: Loan No. 3772- NEP
-
Feasibility Study Development of Agriculture value chain infrastructure, Nepal
-
GRANT No. 0361 NEP: Project Preparatory Facility for Energy – Consulting Services for Detailed Engineering Design and Preparation of Bidding Documents of Lower Seti (Tanahun) Hydropower Project (LSHPP-01) (140MW
-
Preparation of Master Plan for the Development of Solar Lift Irrigation Sub-Project in Karnali River Basin
-
Preparation of Master Plan for the Development of Solar Lift Irrigation Sub-Project in Trishuli River Basin
-
Preparation of Master Plan for the Development of Solar Lift Irrigation Sub-Project in Sunkoshi Tamakoshi River Basin
-
Preparation of Master Plan for the Development of Solar Lift Irrigation Sub-Project in Arun Tamor River Basin
-
Consulting Supervision for Project Supervision Consultant for Electricity Grid Modernization Project (Loan No. 4014 - NEP)
-
Consulting Services for Preparation and Implementation of Resettlement Action Plans (RAP) and Preparation, Supervision of Implementation of Livelihood Restoration Plan (LRP) for the Transmission line of Electric
-
Consulting Services for Construction Supervision of Improvement/Widening of Nagdhunga-Naubise-Mugling Road and Bridges
-
Consulting Services for Power Transmission System Planning, Feasibility Study and Project Preparation for Major Cities of Nepal
-
Consulting Services for Project Implementation Consultant (PIC) Promotion of Solar Energy in Rural and Semi-Urban Regions of Nepal
-
Selection of Project Supervision Consultant (PSC) for Assisting Project Implementation Unit (PIU) of Nepal Electricity Authority (NEA) in Supervising the Contracts of DSEUP (AIIB)
-
Detailed Engineering Design, Tender Document Preparation, and Construction Supervision and Contract Management of Access Road Construction for Upper Arun Hydroelectric Project- PHASE II
-
Consulting Services for Construction Supervision for Transmission Lines and Substations Activities for Electricity Transmission Project
-
Consulting Services for Construction Supervision for Transmission Lines and Substations Activities for Electricity Transmission Project