Funding Agency: Government of Nepal
Client: Department of Roads
Date: May 2012 – April 2013
The main objective of this assignment is to design a safe, reliable and cost-effective bridge using the appropriate technology. The bridge is to be designed considering the availability of skilled manpower, construction material, the condition of accessibility and other prevailing working conditions.
Overall Services provided:
The consultant assists in:
a. Detailed Engineering Study and Survey
b. Desk Study (a desk study should be carried out, collecting all data, maps and information relevant to bridge design and reviewing for planning of further field survey and investigation works as well as detailed design)
c. Subsurface Exploration
d. Analysis of Data, Conclusion, and Recommendation of Design Parameters; Detailed design and quantity/cost estimates