Funding Agency: Swiss Agency for Development and Cooperation (SDC)
Client: District Road Support Project
Date: June 2004 – September 2004
The Detailed Survey, Design and Cost Estimate of Laskot Budhakhani Bankhu District Road of length 15.77 km under the guidelines of the TOR issued by DRSP. The major tasks performed were:
A. Survey work:
B. Design and Drawing Preparation:
C. Quantity and cost estimates preparation:
Overall Services provided:
The major services provided by the firm were as follows:
(i) Detailed Survey and field investigation of 15.77 km of rural road alignment;
(ii) Design and Drawing Preparation using Rajmarg II Road Design Software;
(iii) Quantity and Cost Estimate Preparation according to the norms issued by DoLIDAR.