Funding Agency: World Bank/ RAIDP/ District Development Committee
Client: RAIDP/ District Development Committee
Date: March 2006 – June 2006
The Detailed Survey, Design and Cost Estimate of Dharapani Rupsepani Road Project of Rasuwa District of length 6.00 km under the guidelines of the TOR issued by DDC Rasuwa. The major tasks performed were:
A. Survey work:
B. Design and Drawing Preparation:
C. Quantity and cost estimates preparation:
Overall Services provided:
The major services provided by the firm were as follows:
(i) Detail Survey and field investigation of 6.00 km of rural road alignment;
(ii) Design and Drawing Preparation using Rajmarg II Road Design Software;
(iii) Quantity, Cost Estimate Preparation according to the norms issued by DoLIDAR;
(iv) Tender Documents, BOQ, and Construction Schedule Preparation according to the format of World Bank/ RAIDP.