Consulting Services for the Feasibility study for new transmission facilities in Trishuli 3B Hub and Chilime Hub 220/132/33 kV substations and 220 kV overhead line (26.5 KM Length)

Total Management Services Pvt. Ltd. (TMS) as an associated partner to Lahmeyer International GmbH (LI) had undertaken investigation to assess technical and economic justification of the planned transmission system expansion, which encompasses the following services:

  • Brief Assessment of power sector in Nepal
  • Review and updating of existing Power systems
  • Review of the line route survey

a.      Map Study

b.      Walkover Survey (Baseline Survey)

  • Preliminary survey of new substation areas
  • Feasibility study and conceptualizing its design document.

a.      Transmission Line Concept

                                 i.          Standard design Criteria

                                ii.          Factors of safety

                               iii.          Drawing of defined structures and documents

                              iv.          Tower outline silhouette (Drawings)

b.      Substation Design

                                i.                          Verification of suitability of proposed site

                               ii.                          Electro-mechanical works including protection and control

                              iii.                          Communications and SCADA

                              iv.                          Civil, structural and architectural works

·        Surveys and Investigations

a.      Line route and substation site Survey

b.      Geotechnical Investigations

c.       Soil investigations

  • Training Requirement analysis
  • Cost estimate, Economic and Financial analysis
  • Develop Impact Assessment in the context of macro-economic, socio-economic and economic conditions.
  • Environmental Safeguards

a.      Environment Study

b.      Support the scoping process including developing the proposed TOR for ESIA.

c.       Environment Management Action Plan

d.      Review of IEE of 220kv Trishuli Chilime Transmission Line Social Safeguards

  • Social Safeguards

a.    Social Studies

b.    ESIA Prediction

c.    Resettlement Action Plan(RAP)

d. Social Management Action Plan