Total Management Services Pvt. Ltd. (TMS) as an associated partner to Lahmeyer International GmbH (LI) had undertaken investigation to assess technical and economic justification of the planned transmission system expansion, which encompasses the following services:
a. Map Study
b. Walkover Survey (Baseline Survey)
a. Transmission Line Concept
i. Standard design Criteria
ii. Factors of safety
iii. Drawing of defined structures and documents
iv. Tower outline silhouette (Drawings)
b. Substation Design
i. Verification of suitability of proposed site
ii. Electro-mechanical works including protection and control
iii. Communications and SCADA
iv. Civil, structural and architectural works
· Surveys and Investigations
a. Line route and substation site Survey
b. Geotechnical Investigations
c. Soil investigations
a. Environment Study
b. Support the scoping process including developing the proposed TOR for ESIA.
c. Environment Management Action Plan
d. Review of IEE of 220kv Trishuli Chilime Transmission Line Social Safeguards
a. Social Studies
b. ESIA Prediction
c. Resettlement Action Plan(RAP)
d. Social Management Action Plan