None

TA 4492 - Nepal Power System Master Plan

Funding Agency/Client: Asian Development Bank
Date:  Aug 2008 – Oct 2008

The main project tasks were:

  1. Review the current approach to power system planning;
  2. Assess potential energy sources in the short and long term and estimate investment and operating costs under expansion scenarios and identify a preferred generation development strategy;
  3. Investigate existing hydropower plants efficiency;
  4. Conduct workshops and training;
  5. Prepare a staged transmission development program to deliver forecast power demand to load centers;
  6. Prepare a 10-year demand forecast;
  7. Estimate average cost of supply;
  8. Model and analyze the distribution and transmission networks;
  9. Prepare 5-year capital works plans for transmission and distribution;
  10. Review existing plans, reports and policies regarding hydropower development in Nepal;
  11. Prepare a staged, least-cost, long-term hydropower development program with estimated costs

Overall Services provide

TMS provided project management and technical expertise in hydropower and distribution areas for preparingthe  Power System Master Plan for Nepal.