unding Agency: Government of Nepal
Client: Department of Irrigation
Date: Jul 2016 – Dec 2018
The main objective of this study is to perform a Detailed Feasibility study of the Kaligandaki-Tinau Diversion Multipurpose Project.
A. Hydropower Development Plan – Install capacity of power generation of 104 MW, Length of Tunnel – 30 KM, Diameter of tunnel – 9, Net head available 182 m and Design discharge – 81.96 m
B. Irrigation System Development Plan – command area – 106600 ha. , Main Canal 52 Km, Left Main Canal 14 Km
C. Development of Hydropower system route, which includes detailed engineering design for the following:
D. Review of irrigation facilities in the proposed command area with the water diverted off Kaligandaki River via Tinau River, which is involves the following :
1. Water assessment study for irrigation facilities and Diversion facilities; and
2. Financial study of the total irrigation systems
Total Cost of the Project – Nrs. 40,004,977,870.05
Description of actual services provided by your staff within the assignment:
I. Topography Survey
II. Final site selection
III. Hydrological, meteorological and sedimentation data collection and field measurement; hydrological and meteorological data collection shall be done for all streams pertinent to the final water resource assessment
IV. Verification of previous investigations
V. Construction material survey and testing
VI. Logistic surveys