Funding Agency: SJVNL, India
Client: WAPCOS Limited, India
Date: Apr 2010 – Dec 2011
Arun-III H.E. Project is a run-of-the river scheme, located on the River Arun in Sankhuwasabha of eastern Nepal. The installed capacity of the project is 900MW (4×225 MW) using 4 units of Francis Turbine with capacity of 225 MW each. The annual energy of the project is 3684.31 GWh. The design head is 283.m and discharge of project is 343.42 Cumecs. The project consists of Concrete Gravity Dam with the height of 68m and length of 197.3 m, the Circular type Head Race Tunnel with 11.74 km length and 9.5m Dia, and underground type powerhouse.
Overall Services provided by firm:
TMS is responsible for undertaking all the following activities as part of the EIA study of the Arun project including providing overall support in the preparation, submission and approval of EIA Report of Arun III HEP:
To co-ordinate, liaison and defend the project with concern ministries and Government Institutes.