Funding Agency/Client: Upper Solu Hydro Electric Company Pvt. Ltd. (USHEC)
Date: Aug 2010 – March 2013
The project consists of the preparation of Detailed Project Report of Upper Solu Hydroelectric Project (23.5MW), carry out detailed engineering design, tender documents and construction drawings. The Consultant has completed all the assignment as per ToR. The project is developed by Upper Solu Hydro Electric Company Pvt. Ltd (An ICTC Energy Venture).
The project is located in Solukhumbu district about 300m. Downstream of the operational Salleri Chialsa Small Hydropower Plant (400 kW). The project diverts the design discharge from Solu river and conveys through a canal to Salme village, where forebay, penstock, powerhouse and tailrace are located. The project is close to Okhaldhunga Salleri feeder road, which is presently opened for vehicles with a general load restriction of 6 tons. The main bottleneck in the access road is lack of a bridge over Sunkoshi river at Harkapur at the border of Okhaldhunga and Udayapur districts, which is currently under construction by the GoN, Department of Road. Currently, the vehicles cross the river through locally operated ferry system.
Overall Services provided: