Home
About Us
Services
Projects
Ongoing
Completed
Sectors
Contact Us
Contact Us
Contact Us
[email protected]
01-4535745
Environmental Safeguards
Environmental Safeguards
Some of Our Project In this Service
Selection of Project Supervision Consultant (PSC) for Assisting Project Implementation Unit (PIU) of Nepal Electricity Authority (NEA) in Supervising the Contracts of DSEUP (AIIB)
Consulting Services for Construction Supervision for Transmission Lines and Substations Activities for Electricity Transmission Project - MCA
South Asia Sub-regional Economic Cooperation (SASEC) Power System Expansion Project – Safeguard Implementation and Monitoring Works (Contract No: ESSD-02-2073/074) - ADB/EIB
Consulting Services for Preparation and Implementation of Resettlement Action Plans (RAP) and Preparation, Supervision of Implementation of Livelihood Restoration Plan (LRP) for the Transmission line of Electric - MCA
ADB LOAN-3260 NEP - Earthquake Emergency Assistance Project – Construction Supervision Consultant for Road Component EEAP/DOR/CSC-01
Small Irrigation Programme (SIP) Phase I - SDC
Consulting Services for the Feasibility study for new transmission facilities in Trishuli 3B Hub and Chilime Hub 220/132/33 kV substations and 220 kV overhead line (26.5 KM Length) - KFW
Consulting Services for Feasibility study of Sun Koshi Marin Diversion Project
Detailed Investigations and Engineering Design of Sunsari Morang Irrigation Project Headworks
Consulting Service for Feasibility Study and Detailed Engineering Design for the Sitapaila - Dharke Road - Kuwait Fund
Consulting Services for Power Transmission System Planning, Feasibility Study and Project Preparation for Major Cities of Nepal - ADB
ADB Grant No. 0397-NEP (EF)Services for Preparation of Distribution System/ Rural Electrification Master Plan Contract No. DSMP/REMP-074/75
Feasibility Study & IEE Study of Ikhuwa Hydropower Project (8.6 MW)
Feasibility Study Development of Agriculture value chain infrastructure, Nepal
ESIA, CIA and Social Planning Studies For Upper Arun Hydroelectric Project and Ikhuwa Khola Hydropower Project Power Sector Reform and Sustainable Hydropower Development Project (PSRSHDP) - WB
Kali Gandaki A Hydropower Plant (144 MW) Rehabilitation Project –Implementation of Environmental and Social Mitigation Measures and Monitoring Works - WB
ADB TA-7973 - Strengthening Higher Engineering Education – NEP: (45192-001)
Koshi Corridor 220 KV Transmission Line Project - Exim Bank
ADB TA 4834 NEP - Preparing Governance Reforms and Decentralization Cluster Program I
Detailed Feasibility Study of Kaligandaki- Tinau Diversion Multipurpose Project – 104 MW
Detailed Survey of Marshyangdi 132 kv Transmission Line Corridor Project
Detailed Engineering Design and Tender Document Preparation of Tamakoshi V HEP (87 MW)
Feasibility review, DPR Preparation, Detailed Engineering Design, IEE Review and Preparation of IEE for HEP and 132kv Transmission Line, Preparation of Tender Document for Upper Solu Hydroelectric Project
Collection of field data for one season EIA Study for proposed Pancheshwar/Rupaligad HEP
Undertaking Scoping, TOR, EIA of Proposed Khimti II Hydropower Project (27 MW)
ADB Grant-0227 Nep - Transport Project Preparatory Facility (Formerly Transport Project Preparatory And Capacity Development Facility) – Project Preparatory Consultant 2 For Road Component (Ppc2-Road)
Conception and installation of Bagmati River Basin Decision Support System, Flood Forecasting and Early Warning System, Water Quality Monitoring System and Preparation of Bagmati River Basin Integrate Master Plan
Evaluation of Bid Proposals Supervision and Management of Construction of Solu Hydroelectric Project (23.5 MW)
Feasibility and IEE studies of 5.Chadu Khola; 6.Rupgad Khola 7. Loti Karnali
Hulaki Rajmarg Project-Detailed Survey and Design of 5 Bridges
ADB Loan No. 3255-NEP - Detail Design Consulting (DDC) Services for Melamchi Phase 2 Contract No.: MDS/M2/C/03
ADB TA -7 666 NEP - Energy Access and Efficiency Improvement Project II
Puspalal (Mid Hill) Highway Project: Detailed Design for Upgrading of Highway to Blacktop Standard – Package 3
WB IDA Grant No. H339-NEP - Road Sector Development Project: Feasibility, Detailed Design and Construction Supervision
Detailed Engineering Design & Preparation of Bidding Documents of Rolwaling Diversion
Surveys, Investigations and Detailed Design for Koshi Bridge as VO No. 2 under Road Connectivity Sector I Project – ADB
ADB - Surveys, Investigations and Detailed Design for Sub Regional Transport Enhancement Project as VO No. 4 under Road Connectivity Sector I Project
Detailed Survey, Design, Cost Estimate, Report of Kaliksthan - Bhanjyang-Dhunge Road Project - WB
Community Based Water Supply and Sanitation Project (CBWSSP) : Package I for the Pilot Batch
Consulting Services for Project Management Consultancy (PMC) Melamchi Water Supply Project - ADB
ADB TA No. – 4972-NEP - Preparing the Improved Water Quality Supply, Sanitation and Service Delivery Sector Development Program
Innovations for More Food with Less Water- Task 2: Country and Project-Specific Recommendations and Pilot Initiatives - ADB
Support to EIA Study for proposed Arun – III Hydro Electric Project (900 MW) in Nepal
Consulting Services for Project Preparation and Technical Supervision Services for Electricity Transmission Project: Transmission and Substation Activities - KFW
Kabeli-A Hydroelectric Project - Preparation of Cumulative Impact Assessment (CIA) for the Tamor River Basin, various Environment and Social Safeguards and Capacity Building Activities for the Department of Electricity - WB
ADB Loan 2808/ Grant 0270/ Grant 0271 - Tamakoshi - Kathmandu 220/400 KV Transmission Line Project (ESSD-03-2074/075)
ADB GRANT No. 0361 NEP: Project Preparatory Facility for Energy – Consulting Services for Detailed Engineering Design and Preparation of Bidding Documents of Lower Seti (Tanahun) Hydropower Project (LSHPP-01) (140MW)
Preparation of Master Plan for the Development of Solar Lift Irrigation Sub-Project in Karnali River Basin
Preparation of Master Plan for the Development of Solar Lift Irrigation Sub-Project in Trishuli River Basin
Preparation of Master Plan for the Development of Solar Lift Irrigation Sub-Project in Sunkoshi Tamakoshi River Basin
Preparation of Master Plan for the Development of Solar Lift Irrigation Sub-Project in Arun Tamor River Basin
ADB Loan No. 4014 - NEP - Consulting Supervision for Project Supervision Consultant for Electricity Grid Modernization Project
Enquiry Form
Name
*
Phone
*
Email
Location
Service Enquiry
Choose...
Additional Comments
Submit