Funding Agency: World Bank Client: Power Sector Reform and Sustainable Hydropower Development Project (PSRSHDP)/ Upper Arun Hydroelectric Project (NEA), Nepal Date: July 2018 – Jan 2020 Project components to be covered by this assignment includes the following: S.N Project Component Capacity or Configuration 1 Upper Arun HEP 335 MW 2  Ikuwa Khola HEP  30 MW […]

Funding Agency: Government of Nepal Client:Upper Arun Hydroelectric Project, Engineering Services Directorate, NEA, Tripureshwor, Kathmandu Date: February 2018 – May 2023 The main features of the project are: 24 KM long access road that starts from Gola (proposed powerhouse site of UAHEP, near Barun Bazar)to Chepuwa (proposed dam site of UAHEP)including about 7 km long […]

Funding Agency: Government of Nepal Client: Department of Road, Bridge Branch Date: Sep 2015 – May 2017 The Department of Road, Bridge Branch intends to utilize services of engineering consulting firms well experienced in the fields of soil investigation, hydrological studies, bridge engineering, river training works, environment aspects etc. for providing engineering consulting services for […]

Funding Agency: : Government of Nepal Client: Department of Roads, Planning and Design Branch Planning M & E Unit Chakupat, Lalitpur, Nepal Date: Feb 2017 – July 2017 The main objective of the consulting services are: To perform alignment detailed survey and design To perform socio-economic and traffic study To suggest option of upgrading and […]

Funding Agency: Kuwait Fund Client: Department of Roads Date: Sept.  2013 – July 2016 The mentioned road starts at Sitapaila, in western part of the ring road within the Kathmandu Valley and links it to Dharke, a small settlement at 3-6 km on the Prithivi Highway. This road is an alternative route to enter to the Kathmandu […]

©2013, All Rights Reserved Total Management Services