Funding Agency: Asian Development Bank Client: Nepal Electricity Authority, Nepal Date: October 2017 – October 2019 The Government of Nepal has a policy of providing all district headquarters with grid electricity as soon as practicable and of providing electricity to all the households by 2027. A clear policy on priorities and an execution plan for rural […]

Funding Agency/ Client: The World Bank Date: March 2017 – Nov 2017 The project development objectives are to: Increase access to improved water and sanitation services in project areas; and Develop and implement long-term support mechanism to promote the sustainability of community managed rural water supply schemes in 55 Districts of Nepal. Actual services provided […]

Funding Agency: The World Bank Client:Nepal Electricity Authority, Environment and Social Studies Department Date: Feb 2017 – Aug 2017 Kali Gandaki A Hydro Power Plant (KGAHPP) is the largest plant in operation in Nepal commissioned in 2002. The development objectives of the Kali Gandaki A Hydropower Plant Rehabilitation Project for Nepal are to improve the […]

Funding Agency: : KfW Development Bank Client: Nepal Electricity Authority, Nepal Date: July 2017 – Sept 2017 The project consists of two substations (one existing one in Lekhnath, Pokhara, which will be expanded and a new substation in Damauli) as well as about 40 km of 220 kV transmission line in-between. Also there is one […]

Funding Agency: : Government of Nepal Client: Sunsari Morang Irrigation Project, Department of Irrigation Date: 15 July 2017 – 15 January 2019 The main objective of the consulting service is to prepare the detailed engineering design and procurement documents of SMIP headwork at Chatara. The specific objectives of the services are to: Assess the appropriate […]

Funding Agency: : Kreditanstalt für Wiederaufbau (KfW), KfW Group, Germany Client: Alternative Energy Promotion Centre (AEPC), Nepal Date: April 2017 – Oct 2019 The main objective of the project is to improve the living standard, increase employment and productivity while reducing dependency on traditional energy and attain sustainable development through the integration of alternative energies, […]

Funding Agency/Client: Asian Development Bank Date: May 2017 – Dec 2017 The outcome of the PPTA for the Second Kathmandu Valley Water Supply Improvement Project will be an agreed project design and feasibility study for the ensuing project that satisfies the requirements of the government and ADB, which includes ensuring technical feasibility, economic and financial […]

Funding Agency: Asian Development Bank Client: Melamchi Water Supply Development Board, Nepal Date: Feb 2017 – Feb 2018 The primary objective of the Design Consultancy Services for Melamchi 2: Yangri and Larke Water Diversion Project is to provide services for engineering design including preparation of bidding documents for a project to divert 340 MLD water […]

Funding Agency: Government of Nepal Client: Department of Electricity Development (DoED), Nepal Date: July 2016 – Jan 2019  Rupagad Khola HP is located in Majphal and Dunai VDCs in Dolpa district of Mid-Western Development Region. The proposed headwork site is approximately 5 km South-East of Juphal Airport. The proposed intake site of the project lies […]

Funding Agency/Client: WAPCOS India Ltd., India Date:  Jan 2016 – Jan 2017 Brahmadev-Pancheshwar Access Road is the proposed road alignment for access to the Pancheshwar Multipurpose Project (PMP) site from Brahmadev (Bhimdatta Municipality, Nepal). The PMP is a bi-national hydropower project proposed to develop in Mahakali River bordering Nepal and India with the total estimated […]