Consulting Services for Feasibility Study of Ridi (Gulmi)-Balkot-madichaur-Sulichaur-Surkhet Road (150 Km)
Funding Agency: Department of Roads (DoR)
Client: Department of Roads (DoR)/PMEU
Date: May 2012 – Sept. 2012
The main objective of this assignment is to investigate, economic and environmental feasibility of the Ridi(Gulmi)-Balkot-Madichaur-Sulichaur-Surkhet 150 km Road. Also to investigate minimum three alternative alignments in terms of socio-economic factors of the influence area, traffic, topography, geology, environmental aspects, soil and other related factors along the alignment with maps, sketches, wherever necessary.
Overall Services provided:
Main responsible of the consultants are:
Phase I: Social and Engineering Study Phase
- Field visit for preliminary alignments study
- Socio-economic study of influence are
- Traffic Study
- Geological study
- Meteorological and Hydrological Study
- Environmental Study
- Potential Participation Study
- Material Study
- Alignment Drawing Development
Phase II: Economic Assessment Phase
- Cost Estimation
- Economic Analysis
- Selection and Recommendation of techno-economical and socio-political feasible alignment